Class 5 - Section 8.8.1.2.
Back to all types of systems • List
of Pumpout
Contractors |
|
1. |
A Class 5 sewage system may be installed in
the following circumstances: |
| |
(a) |
Where the proposed
use of the sewage system is for a temporary operation, excluding seasonal
recreational use, not exceeding 12 months in duration, |
| |
(b) |
To remedy an unsafe
sewage system where the remediation of the unsafe condition by the
installation of a Class 4 sewage system is impracticable, |
| |
(c) |
To upgrade a sewage
system serving an existing building, where upgrading through the use of a
Class 4 sewage system is not possible due to lot size, site slope or
clearance limitations, or |
| |
(d)
|
As an interim
measure for a lot or parcel of land until municipal sewers are available,
provided that the municipality undertakes to ensure the continued operation
of an approved hauled sewage system until the municipal sewers are
available. |
| 2. |
Where a Class 5 sewage system is installed, a
written agreement for the disposal of sanitary sewage from the sewage system
shall be entered into with a hauled sewage system operator. |