Class 5
Back to all types of systems
List of Pumpout Contractors
1.  Section 8.8.1.2 of Ontario Regulation 22/98 states:
Class 5 sewage system may be installed in the following circumstances:
(a) where the proposed use of the sewage system is for a temporary operation, excluding seasonal recreational use, not exceeding twelve (12) months in duration:
i) to permit the extension of an existing single-family dwelling provided that:
ii) the extension will not increase the wastewater load, and
iii) the building is already served by a Class 5 sewage system
(b) to remedy an unsafe sewage system where the remediation of the unsafe condition by the installation of a Class 4 sewage system is impracticable
(c) to upgrade a sewage system on an existing lot or parcel of land, where upgrading through the use of a Class 4 sewage system is not possible due to lot size or clearance limitations, or
(d) as an interim measure for a lot or parcel of land until municipal sewers are available, provided that the municipality undertakes to ensure the continued operation of an approved hauled sewage system until municipal sewers are available.
  Where a Class 5 sewage system is installed, a written agreement for the disposal of sanitary sewage from the sewage system shall be entered into with a hauled sewage system operator.
 

Contact informationWebmaster
Leeds, Grenville and Lanark District Health Unit Home Page
May 13, 2008 © Copyright/Disclaimer 2008 • Privacy Statement
In case of public emergency please call 613-345-5685 • An accredited Health Unit since 1990